+
  • 钢结构防腐氟碳漆D-FC- 203.jpg

Steel structure anti-corrosion fluorocarbon paint D-FC-203


The paint consists of Group A components, which include fluororesin, pigments, additives, and solvents, while the curing agent is Group B. When in use, the two components are mixed in the specified ratio. Characteristics: This paint has excellent adhesion, outstanding chemical resistance, and a long aging resistance of up to 15 to 20 years. It features high hardness, abrasion resistance, good toughness, temperature resistance, stain resistance, oil resistance, water resistance, and can cure at room temperature. Uses: It is used for coating ships, highway guardrails, outdoor machinery in ports, transmission towers, microwave transmission towers, offshore drilling platforms, outdoor chemical storage tanks, bridges, oil field drilling equipment, containers, and more.

Category:

Exterior Wall Latex Paint Series


Composition

The paint consists of fluororesin, pigments, additives, and solvents as component A, and the curing agent as component B. When used, the two components are mixed in the specified ratio.

Characteristics

This paint has excellent adhesion, outstanding chemical resistance, a long aging resistance of up to 15 to 20 years, high hardness, abrasion resistance, good toughness, temperature resistance, stain resistance, oil resistance, water resistance, and can cure at room temperature.

Applications

Used for coating ships, highway guardrails, outdoor port machinery, transmission towers, microwave transmission towers, offshore drilling platforms, outdoor chemical storage tanks, bridges, oil field drilling equipment, containers, etc.

Construction Reference

1. Requirements for the surface to be coated:

a. No oil stains, no dust, no rust. b. The surface must be clean and not damp.

2. Apply primer: spraying or brushing is acceptable.

Use a special primer and thinner for fluorine paint. Film thickness: dry film thickness: 30 microns; drying time: 25℃, 24 hours.

3. Requirements for the primer surface: a. The base layer should be uniform, not leaking, not rough, and have good adhesion. b. The base layer should be free of defects, flat, without dust, oil stains, and not damp.

4. Adjusting the topcoat: Ratio: A component:B component = 1:0.045 (weight ratio), use fluorine paint special thinner D-X-2 to adjust the viscosity of the paint. Curing time: under conditions of 15~40℃, cure for 30~50 minutes before spraying. Usable period: 25℃, 8 hours; 35℃, 6 hours; can be adjusted according to temperature.

5. Spraying the topcoat: spraying or brushing is acceptable. Generally, two coats of topcoat are sufficient, with a dry film thickness of 20±5 microns. Interval time is 1 to 2 hours. The interval time between the topcoat and the primer is 24 hours (should be tested first to ensure no biting through before spraying).

6. Drying time: surface dry at 25℃: 20 minutes; actual dry: 24 hours; fully cured: 7 days.

7. The number of spray coats and thickness of the primer and topcoat should be based on the usage conditions and design requirements of the coated object. Storage should be in a cool, dry place, away from fire sources, with effective storage for one year. Packaging: Metal paint: 18kg/set; solid color paint: 24kg/set.

Precautions

1. This paint is a two-component system; when preparing the paint and curing agent, be sure to mix evenly to ensure full mixing. 2. The spraying environment should be clean, with relative humidity not exceeding 75%, and temperature between 5~40℃. 3. The curing agent and thinner for the topcoat and primer should be used as specified and not misused.


Key words:

Steel structure anti-corrosion fluorocarbon paint D-FC-203

Message

* Note: Make sure you fill in the information accurately and keep it open. We will contact you as soon as possible.

Submit

Related Products

Message

* Note: Make sure you fill in the information accurately and keep the communication open, we will contact you as soon as possible.

Submit