+
  • 单组份丙烯酸地坪(油性水泥漆).jpg

Single-component acrylic floor (oil-based cement paint)


Thickness: 0.3mm. Floor characteristics: easy to use with a single component, low cost, quick drying, convenient construction, strong adhesion, dustproof, and diverse colors. Applicable range: 1. Various factories, offices, and other places with low requirements; 2. Warehouses and factories without heavy pressure and chemical solvents. Construction process: 1. Waterproof treatment: The ground floor must have been treated for waterproofing; 2. Base treatment: Perform grinding, repair, and dust removal according to the condition of the base; 3. Newly completed cement floors need to undergo a certain curing period before construction (generally about 3 weeks in summer and about 6 weeks in winter). The floor must be hard, flat, free of oil stains, with a moisture content <6%, strength >24, flatness ≤2mm/M, and pH <8; 4. Acrylic topcoat: Apply two coats of topcoat with a roller, ensuring the overall floor is bright, clean, and uniformly colored after completion. Completion of construction: Can be walked on after 12 hours, and can bear heavy loads after 48 hours (based on 25°C, lower temperatures require an appropriate extension of open time). Construction conditions: The construction surface must be clean and dry, with environmental humidity ≤80%, and 40~60% is optimal. During construction and drying in narrow spaces, good ventilation should be maintained. Statement: The technical reference standards and instructions for this product are for the buyer's reference only.

Category:

Floor paint


Thickness: 0.3mm

Floor characteristics: single component, easy to use, low cost, quick drying, easy construction, strong adhesion, dustproof, diverse colors.

Scope of application:

1. Various factories, offices, and other places with low requirements;

2. Warehouses and factories without heavy pressure and chemical solvents.

Construction process:

1. Waterproof treatment: the ground floor must have been treated for waterproofing;

2. Base treatment: perform grinding, repair, and dust removal according to the condition of the base;

3. Newly completed cement floors need to undergo a certain curing period before construction (generally about 3 weeks in summer, about 6 weeks in winter). The ground must be hard, flat, free of oil stains, with a moisture content <6%, strength >24, flatness ≤2mm/M, PH<8;

4. Acrylic topcoat: roll on two coats of topcoat, and after completion, ensure the overall floor is bright, clean, and uniformly colored.

Construction completion: can be walked on after 12 hours, can bear heavy pressure after 48 hours (based on 25C, lower temperatures require appropriately extended opening time).

Construction conditions: the construction surface must be clean and dry, environmental humidity ≤80%, 40~60% is optimal. During construction and drying in narrow spaces, good ventilation should be maintained.

Statement: The technical reference standards and instructions for this product are for the buyer's reference only.

Process illustration:


Key words:

Single-component acrylic floor (oil-based cement paint)

Message

* Note: Make sure you fill in the information accurately and keep it open. We will contact you as soon as possible.

Submit

Related Products

Message

* Note: Make sure you fill in the information accurately and keep the communication open, we will contact you as soon as possible.

Submit